• D15 and D20 Wing Nut for Formwork Construction
  • D15 and D20 Wing Nut for Formwork Construction
  • D15 and D20 Wing Nut for Formwork Construction
  • D15 and D20 Wing Nut for Formwork Construction
  • D15 and D20 Wing Nut for Formwork Construction
  • D15 and D20 Wing Nut for Formwork Construction

D15 and D20 Wing Nut for Formwork Construction

Material: Cast Iron
Type: Formwork Tie Rod
Finishing: Galvanized
Bar Diameter: 15mm / 20mm
Transport Package: Bundle
Specification: SGS
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
wing nut
Trademark
HORIZON
Origin
China
HS Code
7308400000
Production Capacity
20000 M / Month

Product Description

D15 and D20 wing nut for formwork construction

Wing nut is used in conjunction with waler plates for securing tie rods in formwork
applications.
With different waler plates, wing nuts can be used as anchor nuts both for timber and
steel walers. They can be fixed and loosened by using a hexagon wrench or a thread bar. A hammer strike to the wings can also work.

Working with wing nut, formwork tie rod is to hold and fasten formwork panels tightly.
Normally two types of tie rods are used: dia 15/17mm and dia 20/22mm.
Breaking load>145KN for 15/17mm; Breaking load>230KN for 20/22mm.
Part Name Specification Weight (kg) Remark

Tie-rod
 

D15
D20

1.5 kg/m
2.7 kg/m

L=6m;
Special length available upon request.

Super plate
 

D15 1.28 Used in case of tie-rod and formwork panels are not vertical.

3-lug wing nut
 

D15
D20

0.97
0.78

For tie-rod D15;
For tie-rod D20

Waling plate
 

120 x 120 x 6, Φ19
120 x 120 x 8, Φ19

0.65
0.85

For tie-rod and nut D15;
galvanized

Water stopper
 

D15
D20

0.55
0.72

Used in water resistant wall;
With tie-rod D15 / D20

Anchor plate
 

D20 0.95 Embedded in concrete as lost part
D15 and D20 Wing Nut for Formwork ConstructionD15 and D20 Wing Nut for Formwork Construction
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now