Customization: | Available |
---|---|
Material: | Steel |
Type: | Wall Formwork |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Formwork Tie Rod with Welded Plate as Water Stop
The demand for waterproof walls always means an extra work and needs special care when installing and removing of the formwork anchors with water stops to tighten double side formwork elements.
Non recoverable tie bar with welded intermediate sheet, available for tie rods Ø 15.0 / 20.0 and 26.5 mm
The advantage of this method is that after finishing the works no hollow space remains in the concrete, in which the water can be collected.
The tie bar will be concreted without a wrapping plastic tube in the middle of the wall as a non recoverable part.
To prevent the additional water circulation, a square sheet 120 x 120 mm is welded at center of the tie rod. The non recoverable tie rod will be completed with steel cones as couplers on both sides and extended with the usual tie anchors.
After striking of the formwork, the cones will be removed. The use of the plastic conical sleeve will ease the removing.
Item No. | Bar dia (mm) | Length(mm) | Plate/Spigot (mm) | Weight (Kg) |
WS-15A | 15 | 110 | 60/26 | 0.44 |
WS-15B | 15 | 110 | 65/26 | 0.56 |
WS-15C | 15 | 130 | 110/26 | 0.96 |
WS-20 | 20 | 160 | 80/31 | 1.26 |
The spigot size for tubes inner dia 26mm or 31mm.
Material: Ductile casting, Galvanized
Besides the above specifications, customerized sizes available upon drawing or samples.