Rapid Clamp for Reinforcement Bars

Product Details
Customization: Available
Material: Steel
Type: Rapid Clamp
Still deciding? Get samples of US$ 0/Piece
Request Sample
Manufacturer/Factory, Trading Company
Gold Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
  • Rapid Clamp for Reinforcement Bars
  • Rapid Clamp for Reinforcement Bars
  • Rapid Clamp for Reinforcement Bars
  • Rapid Clamp for Reinforcement Bars
  • Rapid Clamp for Reinforcement Bars
Find Similar Products

Basic Info.

Model NO.
rapid clamp
Finishing
Galvanized
Bar Dia
6-10mm
Transport Package
Bags & Pallet
Trademark
HORIZON
Origin
China
HS Code
7308400000
Production Capacity
200 Tons / Month

Product Description

Rapid clamp for reinforcement bars

Cast iron Cam clamps are very simple to use.

Step 1: After setting up the wooden or steel formwork, pass tie rods through the walls to the formwork at intervals.

Steop 2: A cam clamp is attached to one end of the rod and fixed with a light hammer blow on the head of the wedge.

Step 3: Another cam clamp is applied to the other end of the rod and locked in position like the first, after the rod has been tensioned using the appropriate rapid tensioner.

Step 4: When the operation is completed, the tensioner is removed and the process is continued with the next pair of clamps.

Dismantling the formwork is quicker than ever.

Simply hit the bottom of the clamp wedge with a hammer, the cam clamp is immediately released and is ready for use over and over again.

Bar Ø (mm) Plate size (mm) Weight (Kg)
4-10 43 x 105 0.44
Working with steel bars, rapid clamp is to hold and fasten formwork tightly.
Used for bar dia 6-10mm.
Customized shape and sizes are available on request.
Materials: Ductile casting
Finishing: Self colour, or zinc plated.
Weight: 0.44kg, 0.5kg
Rapid Clamp for Reinforcement Bars
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier