Spring Rapid Clamps for Concrete Formwork and Post Tensioning

Product Details
Customization: Available
After-sales Service: Yes
Warranty: Yes
Still deciding? Get samples of US$ 0/Piece
Request Sample
Manufacturer/Factory, Trading Company
Gold Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
  • Spring Rapid Clamps for Concrete Formwork and Post Tensioning
  • Spring Rapid Clamps for Concrete Formwork and Post Tensioning
  • Spring Rapid Clamps for Concrete Formwork and Post Tensioning
  • Spring Rapid Clamps for Concrete Formwork and Post Tensioning
  • Spring Rapid Clamps for Concrete Formwork and Post Tensioning
  • Spring Rapid Clamps for Concrete Formwork and Post Tensioning
Find Similar Products

Basic Info.

Model NO.
Spring Rapid Clamp
Application
Formwork
Surface Treatment
Yes
Technics
Punched
Material
Steel
Type
Clamp
Finishing
Galvanized
Bar Dia
6-10mm
Transport Package
Bags & Pallet
Specification
75 x 110mm
Trademark
HORIZON
Origin
China
HS Code
7308400000
Production Capacity
200 Tons / Month

Product Description

Spring Rapid Clamps Used in Concrete Formwork and Post Tensioning Work

Spring clip is a very easy and effective way for securing and fastening tie rods in light formwork applications. The tensioner tool is used to pull the tie rod through the clip.

Tie rods with diameters from 5-10mm can pass through the spring clips.

Main application: bracing formwork when being used for foundations or applied to beam formwork.

Load capacity:

6mm tension bar appr. 4KN

8mm tension bar appr. 7KN

10mm tension bar appr. 11KN

Bar Ø (mm) Plate size (mm) Weight (Kg)
5-10 69 x 105 x 3 0.33
5-10 75 x 110 x 4 0.42
Spring Rapid Clamps for Concrete Formwork and Post Tensioning Spring Rapid Clamps for Concrete Formwork and Post Tensioning
Spring Rapid Clamps for Concrete Formwork and Post TensioningSpring Rapid Clamps for Concrete Formwork and Post Tensioning

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier