Formwork Water Stopper to Prevent Water Leakage in Concrete Pouring

Product Details
Customization: Available
Material: Steel
Type: Water Stop
Still deciding? Get samples of US$ 0/Piece
Request Sample
Manufacturer/Factory, Trading Company
Gold Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
  • Formwork Water Stopper to Prevent Water Leakage in Concrete Pouring
  • Formwork Water Stopper to Prevent Water Leakage in Concrete Pouring
  • Formwork Water Stopper to Prevent Water Leakage in Concrete Pouring
  • Formwork Water Stopper to Prevent Water Leakage in Concrete Pouring
  • Formwork Water Stopper to Prevent Water Leakage in Concrete Pouring
  • Formwork Water Stopper to Prevent Water Leakage in Concrete Pouring
Find Similar Products

Basic Info.

Model NO.
Formwork water stopper
Finishing
Self Colour, Galvanized
Standard
DIN 18216
OEM
Yes
Materials
Cast Iron
Transport Package
Pallet
Specification
L=110mm
Trademark
HORIZON
Origin
China
HS Code
7308400000
Production Capacity
200 Tons / Month

Product Description

Water barrier to prevent water leakage in concrete

Water barriers are used in water retaining structures, cast into the concrete wall between two separate tie bars. After pouring, tie rods are removed, the water stop remains in concrete.
Normally two sizes used: for tie rod dia 15/17mm and dia 20/22mm.
Customized shape and sizes are available on request.
Materials: Ductile casting
Finishing: Self colour, or zinc plated.
Bar Ø(mm) Length(mm) Plate/Spigot(mm) Weight(Kg)
15 110 60/26 0.43
15 110 65/26 0.55
15 130 110/26 0.95
20 160 80/31 1.26
Formwork Water Stopper to Prevent Water Leakage in Concrete PouringFormwork Water Stopper to Prevent Water Leakage in Concrete PouringFormwork Water Stopper to Prevent Water Leakage in Concrete PouringFormwork Water Stopper to Prevent Water Leakage in Concrete Pouring

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
 
HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier