Product Description:
1. Single cylinder & single-acting, ball valve, quick clamp connection, operation and cleaning conveniently.
2. Adopt special design rubber parts to connect to the feeding and back port, easy to disassemble.
3. V belt and gear transmission, high efficiency, low failure rate.
4. The special design of the working valve chamber ensures the mortar flow easily, small resistance,
no deposition.
5. The screen adopts rubber spring with cone bolt installation, convenient disassembly.
6. The mixing shaft in the hopper is directly linked to the piston rod, thus this shaft is synchronously moved with the said piston rod effectively prevent mortar precipitation.
7. Equipped with special mortar nozzle, making spraying operation more smoothly, continuously and reducing the rebound effectively.
Speciflcation Features of putty spraying machine:
1. Adjust the size of the flow, tune out the best coating results. 2. In addition to the electrical control box can switch, but also equipped with remote control switch spraying. 3. Gun connection with the feeding tube can be rotated for easy operation. 4. High efficiency, good quality. 5. Easy structure, easy to handling on-site,and accessories is cheap ,easy to maintenance.
Product Show
Specification
Modle |
311 |
318 |
511 |
711 |
12/18 |
Power |
4kw |
4kw |
7.5kw |
7.5kw |
diesel |
Voltage |
220v/380v |
220v/380v |
380v |
380v |
12hp/18hp |
Input pressure |
3mpa |
4mpa |
6mpa |
6mpa |
4mp/6mp |
Horizontal distance |
15m |
15m |
20m |
20m |
15m/20m |
Vertical distance |
10m |
10m |
15m |
15m |
10m/15m |
Through the particles |
≤3mm |
≤3mm |
≤5mm |
≤7mm |
≤5mm |
weight |
150kg |
150kg |
220kg |
280kg |
350kg |
Spraying speed |
50m2/h |
60m2/h |
150m2/h |
200m2/h |
60m2/h / 200m2/h |
Size |
1300*450*600mm |
1200*450*600mm |
1700*550*700mm |
1800*600*700mm |
1700*800*1100mm |
Operation steps of diesel spraying machine:
1. Place the machine in a flat and safe area and have a professional electrician connect to the power cord.
2.Add clean water to the water tank until the contents float.
3. Fill the oil tank and tighten the oil cap.
4. Vent the bottom of the tubing until there is no air.
5. Open and merge fixed
6. Connect to the pipe, air pipe, material pipe, and spray gun.
7. After adding (cement+water) pigging to the hopper, put in the construction materials
8. After all preparations are completed, turn on the power and turn off the clutch and start working
Application Scenarios
Safety instructions for spraying machine use:
1. The machine should be placed in a flat, developed and safe place, and the power cord must be connected by a professional electrician. It must be connected to an effective ground wire and enter the host power supply through the leakage protector. When the voltage is unstable and does not meet the requirements of the machine, immediately stop the operation.
2. It is normal that the machine is difficult to start for the first time. Because the pressure of the high-pressure pump head of the new machine is too high, add a proper amount of lubricating fluid to the hopper, and repeat the manual gear to start the spray.
3. During the operation of the machine, it is strictly forbidden for people to touch the hopper and the rotating place. Minors are not allowed to operate this equipment.
4. If the machine has an abnormal situation, press the emergency button as soon as possible, and restart after troubleshooting.
5. Cut off the power supply for parts replacement and maintenance. Do not modify the structure of the machine without authorization. Regularly check the aging of the line and replace it in time.
FAQ
1.How long of the delivery time?
It takes about 15 working days to delivery the secondary structure column pump machine
2.what isthe warranty time?
1 years
3.Do you have agent ?
We are looking for agent in every country, if you have interesting, feel free tocontact us .
4.How can we use the machine?
we will send the english user manual and video with the machine, if not enough, we can teach you online.
5.What is the MOQ:
1 set
6.What is the payment term?
30% deposit T/T , balance pay against copy of B/L if CIF or CFR. 50% deposit T/T, balanced pay off when we finish the production.