• Cast Iron Scaffolding Joint Pin for Frame Scaffolding System
  • Cast Iron Scaffolding Joint Pin for Frame Scaffolding System
  • Cast Iron Scaffolding Joint Pin for Frame Scaffolding System
  • Cast Iron Scaffolding Joint Pin for Frame Scaffolding System
  • Cast Iron Scaffolding Joint Pin for Frame Scaffolding System

Cast Iron Scaffolding Joint Pin for Frame Scaffolding System

Material: C
Type: Fixed
Structural Style: Soffit Scaffolding
Framework: Combined Scaffolding
Supporting Mode: Floor Type Scaffolding
Lapping Form: High Formwork
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Scaffolding Joint Pin
Erection Position
External Scaffolding
Move Method
Horizontal mobile Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Installation Scaffold
Finishing
Zinc Plated
Transport Package
Bags / Pallet
Specification
L=200mm
Trademark
HORIZON
Origin
China
HS Code
73084000
Production Capacity
50000/Week

Product Description

Cast Iron Scaffolding Joint Pin For Frame Scaffold system

To connect 2 scaffold tubes at 180 degree.

Surface treatment: self colour(black), galvanized upon request.

Safe and standard package, 50 pcs in bags or cartons, and then on pallet, suits for long distance delivery.

Special sizes are available on request.

Items Length Weight (Kg) Tech.
Scaffold joint pin 200mm 0.64 Cast iron
Scaffold joint pin 180mm 0.60 Cast iron

Cast Iron Scaffolding Joint Pin for Frame Scaffolding System

Packing
:

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
--- bundles: timber beam, steel props, tie rod, etc.
--- pallet: small parts will be put in bags and then on pallets.
--- wooden cases: it is available on customer's request.
--- bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.

What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.

Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.

HORIZON FORMWORK, your reliable formwork partner!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now