• Spring Rapid Clamp for Steel Bar Tensioning Work
  • Spring Rapid Clamp for Steel Bar Tensioning Work
  • Spring Rapid Clamp for Steel Bar Tensioning Work
  • Spring Rapid Clamp for Steel Bar Tensioning Work
  • Spring Rapid Clamp for Steel Bar Tensioning Work
  • Spring Rapid Clamp for Steel Bar Tensioning Work

Spring Rapid Clamp for Steel Bar Tensioning Work

Type: Rapid Clamp
Handle Material: Metal
Finishing: Galvanized
Bar Dia: 6-10mm
Material: Steel
Colour: Silver, Golden, or Customerized
Samples:
US$ 0.5/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Spring rapid clamp
Transport Package
Bags & Pallet
Specification
75 x 110mm
Trademark
HORIZON
Origin
China
HS Code
7308400000
Production Capacity
200 Tons / Month

Product Description

Spring rapid clamp for steel bar tensioning work

Spring quick clip is a fast and effective method for securing steel wire bars in light formwork applications. The tensioner tool is used to pull the wire tie bar through the clip.

Steel wire bar diameter from 5-10mm can pass through the spring clip.

Main application: bracing formwork when being used for foundations or applied to beam formwork.

Load capacity:

6mm tension bar appr. 4KN

8mm tension bar appr. 7KN

10mm tension bar appr. 11KN

Bar Ø (mm) Plate size (mm) Weight (Kg)
5-10 69 x 105 x 3 0.33
5-10 75 x 110 x 4 0.42
Spring Rapid Clamp for Steel Bar Tensioning WorkSpring Rapid Clamp for Steel Bar Tensioning WorkSpring Rapid Clamp for Steel Bar Tensioning WorkSpring Rapid Clamp for Steel Bar Tensioning Work

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now