• Flexible Folding Tripod for Stabilizing Slab Form Props
  • Flexible Folding Tripod for Stabilizing Slab Form Props
  • Flexible Folding Tripod for Stabilizing Slab Form Props
  • Flexible Folding Tripod for Stabilizing Slab Form Props
  • Flexible Folding Tripod for Stabilizing Slab Form Props
  • Flexible Folding Tripod for Stabilizing Slab Form Props

Flexible Folding Tripod for Stabilizing Slab Form Props

Material: Steel
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Supporting Mode: Floor Type Scaffolding
Lapping Form: High Formwork
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Folding Tripod
Erection Position
External Scaffolding
Scaffolding Part Type
Scaffolding Props
Construction Properties
Installation Scaffold
Materials
Steel Pipe
Transport Package
Pallet
Specification
H=810mm
Trademark
HORIZON
Origin
China
HS Code
7308400
Production Capacity
20000/Month

Product Description

Flexible Folding Tripod for Stabilizing Slab Form Props

Foldable tripod is used as an easy and quick erection aid of steel prop for slab formwork. By using the tripod, the stability of high and free-standing floor tables can be improved during erection.

The flexibly mounted supporting legs of the tripod permit an optimal fit, even in the corners of the structure.

The forkhead and props are stabilised with a tripod, which can only be used as an erection aid. 

Tripod Specification Description Weight (Kg)
Flexible Folding Tripod for Stabilizing Slab Form Props
 

Tripod H90

 

Made from square tube, heavy duty, for props of great dimensions. Working height 900mm. 9.5
Flexible Folding Tripod for Stabilizing Slab Form Props Tripod H70 Made from square tube, heavy duty, for props of light dimensions. Working height 700mm. 8.5
Flexible Folding Tripod for Stabilizing Slab Form Props Flexible Folding Tripod for Stabilizing Slab Form Props
Flexible Folding Tripod for Stabilizing Slab Form Props

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Flexible Folding Tripod for Stabilizing Slab Form PropsFlexible Folding Tripod for Stabilizing Slab Form PropsFlexible Folding Tripod for Stabilizing Slab Form Props
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now