• Formwork Water Stop with Tie Rod 15mm
  • Formwork Water Stop with Tie Rod 15mm
  • Formwork Water Stop with Tie Rod 15mm
  • Formwork Water Stop with Tie Rod 15mm
  • Formwork Water Stop with Tie Rod 15mm
  • Formwork Water Stop with Tie Rod 15mm

Formwork Water Stop with Tie Rod 15mm

Material: Steel
Type: Wall Formwork
Finishing: Self Color, Galvanized
Length: 110mm, 130mm
Materials: Cast Iron
Usage: Lost in Concrete
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
water stop
Transport Package
Pallet
Specification
D15mm
Trademark
HORIZON
Origin
China
HS Code
7308400000
Production Capacity
200 Tons / Month

Product Description

Formwork water stop connector with tie rod

Water stops are used in water retaining structures, casted into the concrete wall between two separate tie bars, to prevent water seeping alongside the thread bar. After pouring concrete, tie rods are removed, the water stop remains in concrete.

Item No. Bar dia (mm) Length(mm) Plate/Spigot (mm) Weight (Kg)
WS-15A 15 110 60/26 0.44
WS-15B 15 110 65/26 0.56
WS-15C 15 130 110/26 0.96
WS-20 20 160 80/31 1.26

The spigot size for tubes inner dia 26mm or 31mm.
Material: Ductile casting, Galvanized
Besides the above specifications, customerized sizes available upon drawing or samples.

Formwork Water Stop with Tie Rod 15mmFormwork Water Stop with Tie Rod 15mmFormwork Water Stop with Tie Rod 15mmFormwork Water Stop with Tie Rod 15mm
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
 
HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now