• Alignment Clamp Bfd for Formwork Panel Maximo and Trio
  • Alignment Clamp Bfd for Formwork Panel Maximo and Trio
  • Alignment Clamp Bfd for Formwork Panel Maximo and Trio
  • Alignment Clamp Bfd for Formwork Panel Maximo and Trio
  • Alignment Clamp Bfd for Formwork Panel Maximo and Trio
  • Alignment Clamp Bfd for Formwork Panel Maximo and Trio

Alignment Clamp Bfd for Formwork Panel Maximo and Trio

After-sales Service: Yes
Warranty: Yes
Application: Machine Parts
Surface Treatment: Yes
Technics: Punched
Material: Steel
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Maximo clamp
Type
Wall Formwork
Finishing
Galvanized
Weight
4.2kg
Transport Package
Pallet, Wooden Case
Specification
BFD Clamp
Trademark
HORIZON
Origin
China
HS Code
7308400000
Production Capacity
200 Tons / Month

Product Description

Alignment Clamp BFD for Formwork Panel Maximo and Trio
 

The BFD alignment clamp ensures neat panel joints resulting in perfect concrete finishes.

With only one component, every panel connection is flush, aligned and tight.

The BFD clamp guarantees strong joints and fast assembly of the panels.

This is the main component used to join formwork panels. With one single strike of the hammer, it can be used to make panel connections tight joint, no any concrete leak.

The BFD ensures a flexurally stiff connection of panels and allows large units to be moved.

Length (mm) Width (mm) Height (mm) Weight (Kg)
290 260 170 4.24

Alignment Clamp Bfd for Formwork Panel Maximo and TrioAlignment Clamp Bfd for Formwork Panel Maximo and TrioAlignment Clamp Bfd for Formwork Panel Maximo and Trio

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Alignment Clamp Bfd for Formwork Panel Maximo and TrioAlignment Clamp Bfd for Formwork Panel Maximo and Trio
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now