Customization: | Available |
---|---|
After-sales Service: | Video Technical Support, Online Support |
Warranty: | 1year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Modle | 311 | 318 | 511 | 711 | Diesel mortar spraying machine |
Power | 4kw | 4kw | 7.5kw | 7.5kw | diesel |
Voltage | 220v/380v | 220v/380v | 380v | 380v | 12hp/18hp |
Input pressure | 3mpa | 4mpa | 6mpa | 6mpa | 4mp/6mp |
Horizontal distance | 15m | 15m | 25m | 30m | 20m/30m |
Vertical distance | 10m | 10m | 15m | 20m | 15m/20m |
Through the particles | ≤3mm | ≤3mm | ≤5mm | ≤7mm | ≤5mm |
weight | 150kg | 150kg | 220kg | 280kg | 300kg |
Spraying speed | 50m2/h | 60m2/h | 150m2/h | 200m2/h | 60m2/h / 200m2/h |
Size | 1300*450*600mm | 1200*450*600mm | 1700*550*700mm | 1800*600*700mm | 1700*800*1100mm |
1. Adjust the size of the flow, tune out the best coating results.
1.How long of the delivery time?
It takes about 15 working days to delivery the secondary structure column pump machine.
2.what isthe warranty time?
1 years
3.Do you have agent ?
We are looking for agent in every country, if you have interesting, feel free tocontact us .
4.How can we use the machine?
we will send the english user manual and video with the machine, if not enough, we can teach you online.
5.What is the MOQ:
1 set
6.What is the payment term?
30% deposit T/T , balance pay against copy of B/L if CIF or CFR. 50% deposit T/T, balanced pay off when we finish the production.