• Wedge Rapid Clamp for Reinforcement and Formwork Bar
  • Wedge Rapid Clamp for Reinforcement and Formwork Bar
  • Wedge Rapid Clamp for Reinforcement and Formwork Bar
  • Wedge Rapid Clamp for Reinforcement and Formwork Bar
  • Wedge Rapid Clamp for Reinforcement and Formwork Bar

Wedge Rapid Clamp for Reinforcement and Formwork Bar

Application: Formwork
Surface Treatment: Yes
Technics: Casting
Material: Steel
Type: Bar Clamp
Finishing: Painting, Powder Coating, Zinc Plated, HDG
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
rapid clamp
Weight
0.44kg
Bar Dia
6-10mm
Transport Package
Pallet
Trademark
HORIZON
Origin
China
HS Code
7308400000
Production Capacity
200 Tons / Month

Product Description

Wedge rapid clamp for reinforcement bars and  formwork bars

Cam clamps are very simple to use.

After setting up the wooden or steel formwork for concrete casting, tie rods passed through the walls to the formwork at intervals.

A cam clamp is attached to one end of the rod and fixed with a light hammer blow on the head of the wedge.

A second cam clamp is applied to the other end of the rod and locked in position like the first, after the rod has been tensioned using the appropriate rapid tensioner.

When the operation is completed, the tensioner is removed and the process is continued with the next pair of clamps.

Dismantling the formwork is quicker than ever.

Simply hit the bottom of the clamp wedge with a hammer, the cam clamp is immediately released and is ready for use over and over again.

Bar Ø (mm) Plate size (mm) Weight (Kg)
4-10 43 x 105 0.44

1. Material: Ductile iron
2. Weight: 0.44kg or as per customer's request
3. Surface finishing: Galvanized or painted
4. For bar diameter: 6-10mm, or as per your requirement. 
5. Size: 105*40mm
Customized shape and sizes are available on request.
Materials: Ductile casting
Wedge Rapid Clamp for Reinforcement and Formwork Bar
Wedge Rapid Clamp for Reinforcement and Formwork Bar
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now