• Safety Handrail Post for Floor and Slab Formwork
  • Safety Handrail Post for Floor and Slab Formwork
  • Safety Handrail Post for Floor and Slab Formwork
  • Safety Handrail Post for Floor and Slab Formwork
  • Safety Handrail Post for Floor and Slab Formwork
  • Safety Handrail Post for Floor and Slab Formwork

Safety Handrail Post for Floor and Slab Formwork

After-sales Service: Yes
Warranty: Yes
Application: Construction
Surface Treatment: Yes
Technics: Punched
Material: Steel
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Safety Handrail Post
Type
Handrail Post
Materials
Steel Pipe
Outer Pipe
35X35mm
Inner Pipe
30X30mm
Transport Package
Pallet
Specification
H=1.5m, 1.0m
Trademark
HORIZON
Origin
China
HS Code
7308400
Production Capacity
20000/Month

Product Description

Safety Handrail Post for Floor and Slab Formwork

Capable of multiple applications on floors and horizontal slab formwork.

By turning the crank at top of the rail post, it can fit to the slab thickness up to 400 mm.

Wood plank (max. 50 mm x 100 mm) can be nailed on the post.

Scaffold tube can be fixed on the post by clamps.

Can be used for fall protection.

Painted, Powder coated, and galvanized finishing available.

As protection against falling down from the floors or slab formwork, it has to be secured by guardrail post with fence of wood plank or scaffold tubes.

Tube (mm) Width (mm) Height (mm) Weight (Kg)
30 30 1500 6.5
Safety Handrail Post for Floor and Slab FormworkSafety Handrail Post for Floor and Slab FormworkSafety Handrail Post for Floor and Slab FormworkSafety Handrail Post for Floor and Slab Formwork
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now