• Telescopic Scaffolding Prop for Slab Shoring
  • Telescopic Scaffolding Prop for Slab Shoring
  • Telescopic Scaffolding Prop for Slab Shoring
  • Telescopic Scaffolding Prop for Slab Shoring
  • Telescopic Scaffolding Prop for Slab Shoring
  • Telescopic Scaffolding Prop for Slab Shoring

Telescopic Scaffolding Prop for Slab Shoring

Material: Steel
Type: Fixed
Structural Style: Soffit Scaffolding
Supporting Mode: Floor Type Scaffolding
Erection Position: External Scaffolding
Move Method: Disassemble
Samples:
US$ 50/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Scaffolding prop
Scaffolding Part Type
Scaffolding Props
Construction Properties
Building Scaffold
Size
Light Duty and Heavy Duty
Height Range
3m, 3.5m, 4.0m, 5m
Finishing
Painting, Powder Coating, Zinc Plated, HDG
Following Standard
En1065 or Tailor-Made
Transport Package
Pallet
Specification
SGS
Trademark
HORIZON
Origin
China
HS Code
7308400
Production Capacity
20000/Month

Product Description

Telescopic Scaffolding Prop for Slab Post Shoring

Steel prop is an important scaffolding component of HORIZON formwork system, especially in the slab formwork. With the prop's high loading capacity, low weight and stability, HORIZON slab formwork works safely and efficiently on site as well as cost-effective. Also, the prop is fast and easy for handling on site.

Specifications:
Working height range: 1.5m-3.0m, 2.0m-3.5m, 2.2m-4.0m, 3.0m-5.5m
Inner tube dia(mm): 40mm, 48mm, 60mm
Outer tube dia(mm):  48mm, 56mm, 60mm, 75mm
Wall thickness:  From 1.6mm to 4.0mm
Surface finished:  Painted / powder coated / galvanized / HDG
Special requirment available upon request.
Telescopic Scaffolding Prop for Slab Shoring
Telescopic Scaffolding Prop for Slab ShoringTelescopic Scaffolding Prop for Slab ShoringTelescopic Scaffolding Prop for Slab Shoring

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now